Lake Davis to Lake Greenwood
21/02/2019 - by: upwork
Awarded the contract by the City of Orlando, SanPik installed approximately 3,000ft of storm drainage ranging from 18″ up to 54″. SanPik also installed a large baffle box, approximately 2,000ft of 8″ sanitary sewer with manholes and a 2″ water main replacement. The project value was $3.25 Million.
21/02/2019 - by: upwork