Lee Vista Promenade, Sanitary Sewer Improvements

20/02/2017

The project consisted of the 565ft long installation of 10″ and 12″ gravity sewer with 12″ and 15″ gravity sewer with a starting at a 21ft depth. The job consisted of de-watering, which we performed ourselves, and by-pass pumping in a heavy traffic area. Safety was, of course, our number one concern entering this job because we would be dealing with a lot of existing utility conflicts. And, indeed it made pulling a trench box rather challenging. Being up to the task, we thought to utilize stacking trench boxes, sheet piles, and conventional sheeting and shoring to get the job done safely and efficiently. Our entire work crew paid extra attention to the needs of the community, especially those who regularly came upon our work area on their walking and driving route. Because we waded through those complications as a team, we were able to complete the job ahead of schedule. The project value was $357K.