MLK Roadway & Pedestrian Improvements

28/04/2020

The work generally consisted of the complete reconstruction of MLK Blvd, widening the sidewalks to 8-feet on both sides, curb and gutter, new water main and water services, gravity sewer system and sewer laterals, relocating power poles to backside of sidewalk, landscaping and irrigation, and street lights. The project value was $2.9 Million.