MT. DORA MASTER LIFT STATION #53
07/10/2021 - by: upwork
This project included the installation of a brand-new lift station for the City of Mt. Dora. The lift station included two 30ft deep wet wells, 85HP pumps, associated mechanical piping, 400kw generator and site work. The offsite work included approximately 16,000 ft of 2” HDPE conduit via directional drill, 1,000 ft of PVC WM and RWM, 500ft of 12” gravity sewer and three jack & bores underneath an active railroad. This contract value was $2.2 million.
07/10/2021 - by: upwork