South Bermuda

21/02/2019

For this project, SanPik Incorporated was subcontracted by Wharton Smith Inc. and was responsible for cutting and removing approximately 25′ of damaged 42” ductile iron pipe. The ductile iron pipe was replaced with 42”C905 DR21 PVC. The work also included by-passing the existing sewer as well as dewatering via a well point system. The project value was $70K.

21/02/2019