SR46, Utility Relocations
20/02/2017 - by: Bill Picek
Installation of approximately 27,000ft of force main, water main and reclaim water main. Pipe sizes range from 6” up to 24” in size. We also installed approximately 1,500ft of 10” gravity sewer and manholes. After the installation of the above-mentioned pipe, 24,000ft of the original pipe was removed. The project value was $1.35 Million.
20/02/2017 - by: Bill Picek