Experts in complex and eco-friendly water and wastewater projects.

Our Main
Service Areas

Trusted by Government Entities and Municipalities Statewide

SanPik, Inc. has been called upon time and again to handle large-scale, mutli-million dollar water pipeline, wastewater utility, and storm drainage projects because we have the proven expertise and skill to deliver long-lasting, quality results.

We understand the importance  of properly-engineered water and wastewater transit systems to provide vital utility services, protect the environment, and ensure public safety — especially in complex and environmentally-sensitive situations.

Trust SanPik, Inc. to get the job done right, on time and on budget.

Because Quality and Experience Matter.

FEATURED PROJECTS

City of Maitland Lift Station #1 Relocation

MORE IMAGES

(click for larger view)

Client: City of Maitland
Location: Maitland, Florida
Project Value: $6 million

SanPik was awarded this job by the City of Maitland in 2021. This job consisted of the installation of 6,000lf of PVC sewer pipe sizes ranging from 8″ to 24″. 3,320lf of 14″ HDPE Force Main. Complete road, sidewalk and landscape restoration. Also included demolition of existing lift station and the installation of a new submersible triplex lift station.

Lift Station 33 Osceola Parkway Gravity Sewer Rehabilitation

MORE IMAGES

(click for larger view)

Client: TOHO Water Authority
Location: Kissimmee, FL
Project Value: $1.8 million

SanPik Inc. was awarded this project in 2023 by the TOHO Water to open cut and replace gravity sewer mains, laterals, and manholes. The project also consisted of the rehabilitation of gravity sewer mains and laterals by use of Cured-In-Place-Pipe (CIPP) lining, and manholes by sealing and coating.

Lift Station 18 Scott Blvd Gravity Sewer Rehabilitation

MORE IMAGES

(click for larger view)

Client: TOHO Water Authority
Location: Kissimmee, FL
Project Value: $10.1 million

TOHO Water Authority awarded this project to SanPik Inc. This project consisted of replacing gravitysewer mains, laterals, and rehabilitate gravity sewer mains and laterals by Cured-In-Place-Pipe (CIPP) lining, and rehabilitate manholes by sealing and coating, within the Scott Blvd area.

Lift Station 1B Gravity Sewer Rehabilitation

MORE IMAGES

(click for larger view)

Client: TOHO Water Authority
Location: Kissimmee, FL
Project Value: $3.9 million

TOHO Water Authority awarded this project to SanPik Inc. This project consisted of replacing gravity sewer mains, laterals, and rehabilitate gravity sewer mains and laterals by Cured-In-Place-Pipe (CIPP) lining, and rehabilitate manholes by sealing and coating, within the LS-1B Hermosillo basin service area.

Sandhill WRF Linework

MORE IMAGES

(click for larger view)

Client: TOHO Water Authority
Location: Kissimmee, FL
Project Value: $800,000

SanPik was the subcontractor for this project under Wharton Smith who was the general contractor. SanPik was contracted to install all the linework utilities on the TOHO Wastewater Treatment plant. SanPik installed approximately 3,500LF of 16” and 24” DIP.

Ponce De Leon Septic To Sewer Project

MORE IMAGES

(click for larger view)

Client: Town of Ponce Inlet
Location: Ponce Inlet, Florida
Project Value: $1,039,710

This project consists of construction of approximately 1,200 LF of 8” PVC gravity sewer and sanitary manholes, 1,300 LF of force main as well as a new lift station including wet well, pumps, valves, piping and electrical. Selective demolition, minor stormwater revisions and restoration items are included as well.

Mt. Dora Master Lift Station #53

MORE IMAGES

(click for larger view)

Client: City of Mt. Dora
Location: Mt. Dora, FL
Project Value: $2.2 million

This project included the installation of a brand-new lift station for the City of Mt. Dora. The lift station included two 30ft deep wet wells, 85HP pumps, associated mechanical piping, 400kw generator and site work. The offsite work included approximately 16,000 ft of 2” HDPE conduit via directional drill, 1,000 ft of PVC WM and RWM, 500ft of 12” gravity sewer and three jack & bores underneath an active railroad.

DB Lee WRF Gravity Interceptor

MORE IMAGES

(click for larger view)

Client: City of Melbourne
Location: Melbourne, FL
Project Value: $1.4 million

SanPik Inc was awarded this project by the City of Melbourne. The project consisted of approximately 2,000’ of 36” Gravity Sewer, 160’ of gravity sewer installed by jack & bore with a 54” steel casing. The installation of 11 manholes ranging from 12ft deep up to 20ft deep and the removal of 800’ of 8” gravity sewer pipe. The entire project required dewatering via well points. There was also sidewalk, road, and landscape restoration as part of this project.