Lift Station 1B Gravity Sewer Rehabilitation

TOHO Water Authority awarded this project to SanPik Inc. This project consisted of replacing gravity sewer mains, laterals, and rehabilitate gravity sewer mains and laterals by Cured-In-Place-Pipe (CIPP) lining, and rehabilitate manholes by sealing and coating, within the LS-1B Hermosillo basin service area.
Sandhill WRF Linework

SanPik was the subcontractor for this project under Wharton Smith who was the general contractor. SanPik was contracted to install all the linework utilities on the TOHO Wastewater Treatment plant. SanPik installed approximately 3,500LF of 16” and 24” DIP.
Ponce De Leon Septic To Sewer Project

This project consists of construction of approximately 1,200 LF of 8” PVC gravity sewer and sanitary manholes, 1,300 LF of force main as well as a new lift station including wet well, pumps, valves, piping and electrical. Selective demolition, minor stormwater revisions and restoration items are included as well.
Mt. Dora Master Lift Station #53

This project included the installation of a brand-new lift station for the City of Mt. Dora. The lift station included two 30ft deep wet wells, 85HP pumps, associated mechanical piping, 400kw generator and site work. The offsite work included approximately 16,000 ft of 2” HDPE conduit via directional drill, 1,000 ft of PVC WM and […]