Lake Marion

SanPik Incorporated was subcontracted by Garney Construction to complete the installation of all of the yard piping for a treatment plant which included force main, portable water main, drain lines, reclaimed water main, sanitary sewer pipes, manholes, 2ea lift stations and other mechanical piping all ranging in sizes from 2” through 36”.
South Bermuda

For this project, SanPik Incorporated was subcontracted by Wharton Smith Inc. and was responsible for cutting and removing approximately 25′ of damaged 42” ductile iron pipe. The ductile iron pipe was replaced with 42”C905 DR21 PVC. The work also included by-passing the existing sewer as well as dewatering via a well point system.
Lake Davis to Lake Greenwood

Awarded the contract by the City of Orlando, SanPik installed approximately 3,000ft of storm drainage ranging from 18″ up to 54″. SanPik also installed a large baffle box, approximately 2,000ft of 8″ sanitary sewer with manholes and a 2″ water main replacement.
Flewelling Avenue Stormwater Treatment System Project

This quick project, which was awarded to SanPik, Inc. by the City of Ocoee consisted of the installation of approximately 500’ of RCP pipe ranging from 15” to 54” diameter and 5 structures.