Cypress West WRF

Working for Wharton Smith Inc., SanPik completed the installation of approximately 4,000ft of Force Main, Gravity Sewer, Stormwater Drainage and a 24” Injection Line. Despite the site being heavily congested, SanPik was able to plan efficiently with numerous subcontractors and maintain a tight schedule to complete the scope of work on time.
Bluford Ave Phase 2

Working for Oelrich Construction, SanPik installed approximately 13,000ft of force main, water main and reclaim water main PVC and ductile iron pipe ranging from 4” to 24”. The installation also included stormwater RCP pipe, manholes of approximately 1,300ft, sanitary sewer manholes and approximately 1,500ft of PVC piping. Throughout the project SanPik also removed and abandoned […]
Cloud Branch Drainage Improvements Phase III

SanPik was awarded the contract by the City of Sanford for drainage improvements covering a large community near downtown Sanford from 10th Street to 20th Street. The project included over 7,000’ of RCP drainage pipe varying from 15” up to 72” diameter. Included in this project was also over 100 drainage structures and other various […]
SR46 Utility Relocations

Installation of approximately 27,000ft of force main, water main and reclaim water main. Pipe sizes range from 6” up to 24” in size. We also installed approximately 1,500ft of 10” gravity sewer and manholes. After the installation of the above-mentioned pipe, 24,000ft of the original pipe was removed.