Sandhill WRF Linework

SanPik was the subcontractor for this project under Wharton Smith who was the general contractor. SanPik was contracted to install all the linework utilities on the TOHO Wastewater Treatment plant. SanPik installed approximately 3,500LF of 16” and 24” DIP.
Ponce De Leon Septic To Sewer Project

This project consists of construction of approximately 1,200 LF of 8” PVC gravity sewer and sanitary manholes, 1,300 LF of force main as well as a new lift station including wet well, pumps, valves, piping and electrical. Selective demolition, minor stormwater revisions and restoration items are included as well.
Mt. Dora Master Lift Station #53

This project included the installation of a brand-new lift station for the City of Mt. Dora. The lift station included two 30ft deep wet wells, 85HP pumps, associated mechanical piping, 400kw generator and site work. The offsite work included approximately 16,000 ft of 2” HDPE conduit via directional drill, 1,000 ft of PVC WM and […]
DB Lee WRF Gravity Interceptor

SanPik Inc was awarded this project by the City of Melbourne. The project consisted of approximately 2,000’ of 36” Gravity Sewer, 160’ of gravity sewer installed by jack & bore with a 54” steel casing. The installation of 11 manholes ranging from 12ft deep up to 20ft deep and the removal of 800’ of 8” […]