DB Lee WRF Gravity Interceptor

SanPik Inc was awarded this project by the City of Melbourne. The project consisted of approximately 2,000’ of 36” Gravity Sewer, 160’ of gravity sewer installed by jack & bore with a 54” steel casing. The installation of 11 manholes ranging from 12ft deep up to 20ft deep and the removal of 800’ of 8” […]

Aloma Avenue And Dean Road Gravity Main Reconnection

SanPik was awarded this project as part of a continuing contract with South Seminole and North Orange County Wastewater Transmission Authority (SSNOCWTA). This project consisted of the installation of 1,500’ of HDPE ranging from 4” to 16”. We also installed approximately 60ft of 42” PVC FM, 220ft of 36” PVC FM along with 42” and […]

Virginia Monroe Stormwater System

Construction of two storm water pump stations with force mains, two storm water ponds and additional conveyance enhancements such as inlets and storm water pipes. Installation of 1,900’ of RCP in various sizes ranging from 12” up to 36”. Construction of water services along with new water mains, road restoration along with concrete curb, sidewalk, […]

MLK Roadway & Pedestrian Improvements

The work generally consisted of the complete reconstruction of MLK Blvd, widening the sidewalks to 8-feet on both sides, curb and gutter, new water main and water services, gravity sewer system and sewer laterals, relocating power poles to backside of sidewalk, landscaping and irrigation, and street lights.