Gravity Wastewater System Improvements

Included gravity sewer utilities repaired and rehabilitated in 9 sub-areas throughout Orange County. Installation consisted of approximately 2,300ft of gravity sewer, replacement of 16 manholes and relocation of 39 sewer laterals. Most of the work required dewatering, bypass pumping and were 14ft to 22ft deep.
Lake Marion

SanPik Incorporated was subcontracted by Garney Construction to complete the installation of all of the yard piping for a treatment plant which included force main, portable water main, drain lines, reclaimed water main, sanitary sewer pipes, manholes, 2ea lift stations and other mechanical piping all ranging in sizes from 2” through 36”.
South Bermuda

For this project, SanPik Incorporated was subcontracted by Wharton Smith Inc. and was responsible for cutting and removing approximately 25′ of damaged 42” ductile iron pipe. The ductile iron pipe was replaced with 42”C905 DR21 PVC. The work also included by-passing the existing sewer as well as dewatering via a well point system.
Lake Davis to Lake Greenwood

Awarded the contract by the City of Orlando, SanPik installed approximately 3,000ft of storm drainage ranging from 18″ up to 54″. SanPik also installed a large baffle box, approximately 2,000ft of 8″ sanitary sewer with manholes and a 2″ water main replacement.