MLK Roadway & Pedestrian Improvements
28/04/2020 - by: upwork
The work generally consisted of the complete reconstruction of MLK Blvd, widening the sidewalks to 8-feet on both sides, curb and gutter, new water main and water services, gravity sewer system and sewer laterals, relocating power poles to backside of sidewalk, landscaping and irrigation, and street lights. The project value was $2.9 Million.